💪 Work = force × distance
🚫 No movement, no work
⚖️ Less force, same work
Settings
💡 Learning tips
How deep?
Other labs
?
- Pick a level with the level button at the top. Levels are grouped like the book: Work = force × distance, No movement no work, Less force same work.
- Crane, crate and piano: follow the 3 steps on the panel (force, distance, force × distance), then type that energy in the 🔋 energy box (or use −100 / +10 … and the slider) and press ▶ Start (or Enter). Job 1 is worked out for you.
- Referee level: watch the crane, then press ← Work done or → No work.
- Press Start. Pause, Resume, or Step 0.1 s at a time.
- Settings lock during a run. Press Reset to change them.
- A game ends after its last round.
- Tap the stage to switch numbers mode on or off.
Keyboard: Space play/pause, → step, R reset.
Work: Work is done when a force moves something along the direction of the force: work = force × distance, in joules (J). No movement, no work, however hard you push.
Loading 3D…
Controls
Guess first: Lifting the same sofa twice as high (floor 2 instead of floor 1) takes…
Press Start to see the first job.
Level goal
Charge the crane's battery with just enough energy to lift each load. Too little: stuck in mid-air! Too much: the customer won't pay for it.
What is happening?
- A crane needs energy to lift things. The energy used to move something with a force is called WORK.
- Work = force × distance (W = F × d). Force is in newtons (N), distance in metres (m), work in joules (J). 1 J = 1 N × 1 m.
- Which force? Gravity pulls the load DOWN. To lift it slowly, the crane must pull UP just as hard. That pull is the load's weight.
- Weight = mass × 9.8. Every kilogram is pulled down by 9.8 N on Earth. So a 40 kg sofa weighs 40 × 9.8 = 392 N.
- Which distance? How high it goes. Each floor is 3 m, so floor 1 = 3 m, floor 2 = 6 m.
- Worked example, job 1: 392 N × 3 m = 1,176 J. Type 1176 in the energy box and press Start (up to 10 % more is fine).
- Job 2: the same sofa, twice as high. Job 3: twice as heavy. Use the same 3 steps and see how the work changes.
Try at home
Stairs and a school bag
- Weigh your school bag on a bathroom scale (say 5 kg). Its weight is about 5 × 9.8 = 49 N.
- Measure the height of one step (about 0.17 m). Count the steps up one floor.
- Work to carry the bag up one floor = 49 N × (number of steps × 0.17 m). Two floors: twice as much.
Walk, don't run, on the stairs.
Who uses this?
Crane and lift engineers
They work out the work (and the power) needed to lift every load to every floor, so they can choose a motor that is big enough but not wasteful.
What are we learning?
Work is done when a force moves something along the force: work = force × distance, in joules. Lifting twice as high takes twice the work. Holding something still takes no work at all, however hard you push.
Where does this happen in real life?
A crane lifting bricks up a building, a lift carrying people to the 10th floor, a tractor pulling a plough, a person pushing a trolley: all of them do work. A guard standing still with a heavy bag gets tired, but does no work on the bag.
The physics principle
Work is force times distance: W = F × d. It is measured in joules: 1 J = 1 N × 1 m.
Only the distance moved along the force counts. If the force is at an angle θ to the motion, W = F × d × cos θ. At 90° (cos 90° = 0) the force does no work.
Work comes in two kinds: work against another force (lifting against gravity, dragging against friction, stretching a spring), and work that changes speed (speeding a car up or slowing it down).
A simple explanation
Work is the push times how far the push carries something. Push twice as hard, or twice as far, and you do twice the work. Push on something that does not move, and the work is zero: you get tired because your muscles keep tightening and relaxing inside you, not because you gave the object any energy.
Why did this happen?
Rooftop deliveries. A 40 kg sofa weighs 40 × 9.8 = 392 N. Lifting it 3 m takes 392 × 3 = 1,176 J; to floor 2 (6 m), 2,352 J. The 80 kg buffalo weighs twice as much: 784 × 6 = 4,704 J.
Mango crate drag. Friction on 100 kg of mangoes on concrete (μ = 0.5) is 0.5 × 100 × 9.8 = 490 N: 8 m takes 3,920 J, 16 m takes 7,840 J. On the mopped floor (μ = 0.2) friction is 196 N, so 8 m takes only 1,568 J.
Work or no work? Holding the crate still: the crane pulls up with 784 N, but d = 0, so W = 0. Swinging it round at the same height: the pull is up, the motion is sideways, so W = F × d × cos 90° = 0. Only lifting it 3 m did work: 784 × 3 = 2,352 J.
Piano into the truck. 150 kg weighs 1,470 N. Straight up 1.5 m: 1,470 × 1.5 = 2,205 J. On a smooth 3 m ramp the pull is only 1,470 × 1.5 ÷ 3 = 735 N, but over 3 m: 735 × 3 = 2,205 J. On the 6 m ramp: 367.5 × 6 = 2,205 J. Less force, more distance, the same work.
Model assumptions
- Every machine moves its load at a steady speed, so its pull equals the force it works against.
- g = 9.8 N/kg. The crane’s hook, cable and the dolly have no mass; the ramps have no friction.
- The machine gets exactly the energy you quote and wastes none; when it runs out, its brake holds the load.
- The engine stops the load exactly where the energy runs out, so the result does not depend on the 10 ms step.
Engineering applications
Lift and crane engineers work out the work (and the power, work per second) needed for every load, so they can choose the motor. Road engineers build gentle hairpin roads up hills so lorries need less force, even though the road is longer.